
30,000 m³/year · System assembly
Oil sludge treatment line
Integrated treatment equipment assembled and prepared for site installation, with process stages coordinated as one system.

Project overview
Integrated treatment equipment assembled and prepared for site installation, with process stages coordinated as one system.
Coordination and delivery
- Stated treatment scale: 30,000 m³/year.
- Equipment is assembled as an integrated treatment system.
- The record shows preparation for installation on site.
01 · Define
Feed, capacity, standards, utilities and site constraints.
Share feed composition, required throughput and separation targets. Include voltage, frequency, hazardous-area requirements and available installation space.
02 · Engineer
Process route, equipment matching, layout and documentation.
Review the process stages and equipment interfaces together. Confirm the layout, supply boundaries and technical documents before approving the configuration.
03 · Build & verify
Fabrication, assembly, inspection and pre-shipment checks.
Agree the inspection scope and acceptance criteria in the project documents. Coordinate assembly checks, document review and readiness for dispatch.
04 · Deliver & support
Export packing, logistics coordination and commissioning interface.
Confirm destination, packing requirements and transport interfaces. Define installation responsibilities, commissioning inputs and spare-parts requirements.
Discuss your project